March Project Update 2021

Here's the latest: Location: McMurray Ave. Work Task: The offsite sidewalk along the South end of McMurray Ave will be replaced. Start Date: March 5, 2021 End Date: TBD Location: McMurray Ave Work Task: The offsite sidewalk along the North end of McMurray Ave will be replaced. Start Date: March 29, 2021 End Date: TBD…

Read More

March Project Update 2021

Here's the latest: Location: McMurray Ave. Work Task: The offsite sidewalk along the South end of McMurray Ave will be replaced. Start Date: March 5, 2021 End Date: TBD Location: McMurray Ave Work Task: The offsite sidewalk along the North end of McMurray Ave will be replaced. Start Date: March 29, 2021 End Date: TBD…

Read More

February Project Update 2021

Here's the latest: Fire alarm panel upgrade – February 8-22 Mircom will start test at the top of each tower and work down. Firewatch will be set up by Graham for the duration of this work. Device verification in common areas of both towers – Feb 11 to Feb 19, 2021 Confirm device audio at…

Read More

December Project Update 2020-2

1. Location: Tower 1 – Stairwell P2 to L18 Work Task: Scanning, coring and pipe install in existing stairwell for Sprinkler work. Loud noise associated with coring and pipe install. Work sequence and associated dates: a) Scanning – Completed; b) Coring – January 6 to January 11, 2021 3) Pipe Install – TBD closer to…

Read More

December Project Update 2020

    DATE WORK ACCESS & LOADING IMPACT   Dec 7, 2020 – Dec 11, 2020 Removing all trees and plant cover in the green “Graham’s Fenced Work Area” shown Residents need to exit in the paths No impact on loading area shown in yellow   Dec 14, 2020 – Jan 8, 2021 (tentative, see…

Read More

November Project Update 2 – 2020

Tower 2 (Tower B) – Grange Street Stairs Demo of existing retaining wall at stairs to allow for membrane tie-in between lamination slab and existing. Loud noise and vibration associated with demo work sporadically throughout duration of work. Access/egress to existing stair case and Tower 2 East entrance will be maintained and restricted during work…

Read More

November Project Update – 2020

General: Location: L2 outdoor court – Ramp Work Task: Construction of the temporary ramp to the West side of the existing ramp. Residents will be able to use the new ramp as of November 5, 2020 Location: L2 outdoor court – Landscape Removal/Demo Work Task: Existing landscape to be removed and structural demo to follow. Demo noise throughout duration.…

Read More

September Project Update – 2020

General: Location: L2 outdoor court – Ramp Work Task: Construction of the temporary ramp to the West side of the existing ramp. Tenant access/egress through this area will be restricted for duration. Will reopen for tenant use October 16, 2020. Start Date: September 29, 2020 October 5, 2020 End Date: October 8, 2020 October 16, 2020 Note: Pushed because structural…

Read More

August Project Update 2020 – 2

Here are the latest project updates and their impacts to you: The New Tower Location: Landscape @ North Vent Shaft Work Task: Scan/drilling for lamination and concrete pour. Noisy work associated with drilling. Start Date: August 20, 2020 End Date: September 10, 2020   Townhouses Location: P1 – Townhouse Drive Aisle Work Task: Concrete lamination pour #2. Includes drilling dowels. Noise from…

Read More

August Project Update 2020

Here is the latest: Location: Hazel St. Sidewalk Work Task: Topsoil and shotcrete removal. Loud noise associated with the chipping of shotcrete. Start Date: August 10, 2020 End Date: August 26, 2020 Location: Tower Autocourt Work Task: Hot rubber roofing. Strong odours. Start Date: August 17, 2020 End Date: August 25, 2020 Location: Landscape @ North Vent Shaft Work Task: Scan/drilling…

Read More